The first year

Work and Sweat

Posted on

Summer 2016 The summer in 2016 was mostly spent on the maintenance on deck. The fittings of the poles were reinforced because there were a lot of stresscracks. By opening the ceiling inside I could see why. They fitted the poles with small bolts without a counterplate and they didn’t use the whole sandwich construction but […]