Getting closer

Posted on 2 Comments

March 2017 Well, the date for the launching is set. The 8th of May Hoppetossa will be launched into her natural environment. So now the end rush is coming. But before that we visited the boat fair in Stockholm. It was a sweet little fair (what a difference with Dusseldorf) and we visited some companies. One […]

Snow and cold weather

Posted on Leave a comment

Winter 2016/2017 As soon the temperatures dropped I started on the inside job. Taking care of the engine room. When I started to take out wiring I wanted to replace I noticed that the diode bridge that was installed was completely ruined and strangely wired. The generator on the engine (with a charging computer) charged […]